Applicable Requirements

  1. Letter request from the member or developer.
  2. Letter request from the building administrator.
  3. Letter request from the telecommunication carrier/MERALCO.
  4. Authorization, certification or contract with lot owner.
  5. Right-of-way permit from Ayala Property Management Corp. (APMC)
  6. Clearance from the Makati Parking Authority (MAPA).
  7. Permit from the National Water Resources Board.
  8. Drawing showing details of excavation and/or installation. 03 sets
  9. Drawing showing details of repair including its location. 03 sets
  10. Drawing showing the details of the signage/installation including its location. 03 sets
  11. Drawing showing route/location of the installation or activity. 03 sets
  12. Drawing from Meralco or telecom carrier showing the details of the project. 03 sets
  13. Drawing showing details of fence/temporary facility (materials, elevations, alignment/location) 03 sets
  14. Photocopy of payment or official receipt and drawing from the Manila Water Co. (MWC).
  15. Payment of restoration cost.
  16. Payment of deposit.
  17. Architectural drawing duly signed and sealed by the Architect/Engineer and signed by the member-developer on all sheets. 09 sets
  18. Certified True Copy of Transfer Certificate of Title (TCT) with annotation of amended Consolidated and Revised Deed Restriction.
  19. Certified True Copy of TCT or Condominium Certificate of Title (CCT) or Contract of Lease.
  20. Architectural drawing duly signed and sealed by the Architect/Engineer and signed by the member-developer on all sheets. 03 sets
  21. Excavation plan showing system of soil protection. 01 set
  22. Revised Parking Plan.
  23. Payment of Plans Processing Fee and/or Construction Guaranty Deposit.
  24. Payment of Development Charge.
  25. Submission of Performance Bond.

Requirements Needed For Permits

I. SIGNAGE

A. Installation

  1. Letter request from Bldg. Admin or unit owner/contractor noted by Bldg. Admin
  2. Layout with dimensions
  3. Perspective

B. Cleaning/Repair/Removal of Signage

  1.  Letter request from Bldg. Admin or unit owner/contractor noted by Bldg. Admin
  2. Picture of signage

 

II. STREAMER

A. Installation

  1. Letter request from Bldg. Admin or unit owner/contractor noted by Bldg. Admin
  2. Layout with dimensions
  3. Perspective

 

III. EXTERIOR WORKS

A. Repainting/Waterproofing/Repair works

  1. Letter request from Bldg. Admin or contractor noted by Bldg. Admin
  2. Received info from the neighboring buildings (Note: Guaranty Deposit)

B. Cleaning

  1. Letter request from Bldg Admin or Contractor (noted by Bldg Admin)

 

IV. RENOVATION

A. Interior Renovation

  1. Letter request from Bldg Admin or unit owner/contractor (noted by Bldg Admin)
    Three (3) sets Architectural Drawing (Signed & Sealed by Arch. Or Civil Engineer &
  2. Signed by Owner)
  3. Copy of CCT or Contract of Lease

B. Façade Rehabilitation/Renovation

  1. Letter request from Bldg. Owner/Admin
  2. Elevation plan

C. Renovation with Expansion/Additional Floor Area

  1. Letter request from Bldg. Owner/Admin
    Five (5) sets Architectural Drawing (Signed & Sealed by Arch. Or Civil Engineer &
  2. Signed by Owner)
  3. Revised Parking Plans
    Certified true copy of Transfer Certificate of Title (TCT) with annotation of Amended
  4. Consolidated and Revised Deed Restrictions

 

V. NEW BUILDING CONSTRUCTION

  1. Letter request from the member/developer
    Nine (9) sets Architectural drawing duly signed and sealed by the Architect/Engineer
  2. and signed by the member/developer on all sheets
  3. One (1) set each: Plumbing & Sanitary; Fire Protection; Mechanical; & Electrical
    Certified true copy of Transfer Certificate of Title (TCT) with annotation of Amended
  4. Consolidated and Revised Deed Restrictions
  5. Two (2) sets Excavation plan showing system of soil protection
  6. Payment of processing fee and/or Construction Guaranty Deposit
  7. Payment of Development Charge
  8. Submission of Performance Bond

 

VI. Vehicle Passage/Stationing

A. Letter of request 

  1. Date of Time 
  2. Location
  3. Nearest Bldg.
  4. Palate No.
  5. Type of Vehicle
    -if Mobile Crane/Trailer
    Submit Drawing+ JHA.

 

VII. Telecom/Utility Installation (Telco cable/manhole, drainage/Water/Sewer/Power Connection.

A. AERIAL

  • Letter of Request 
  • Drawing
  • JHA
  • APMC R-O-W

B. EXCAVATION 

  1. Installation Of:
  2. Telecom Conduit & Cable
  3. Drainage /Power
    • Letter of Request
    • Drawing of Excavation
    • APMC R-O-W
    • MAPA Clearance (After Submission of VI. and VII.)
      • *if on side only, NO MAPA

4. Sewer/Water Connection

    • Letter of Request
    • Drawing of Excavation 
    • APMC R-O-W
    • MAPA Clearance
    • Drawing from MWCI
    • JHA 

5. Others

    • Letter of Request
    • Drawing
    • MAPA
    • APMC

 

VIII. Road Closure 

Tower Crane Installation/Del. H/V/A/C, Genset/Etc. Lifting

    • Letter of Request
    • Traffic Management Plan/Drawing
    • Advisory to affected Bldgs.
    • JHA
    • Drawing (positioning of equipment)
    • MAPA clearance (as Applica)

 

IX. Opening of Manhole 

A. Repair and Maintenance 

  • MWCI Sewer /Water /Drainage/power
  • Letter & Drawing 

B. Telco

  • Letter of Request (from telco) Drawing (w/manhole Loc.)
  • JHA

 

X. Drone Flying for Video /Photoshoot

  1. Letter of Request (indicate purpose, Bldg.  be covered, Date/Time
    Street to be covered model of drone.
  2. Endorsement from Bldg. Admin.
  3. Affidavit (Notarized) stating.
    • Will not take shoot towards other bldg. & Individuals
    • Will not Violate the privacy of anyone.

     4. Photocopy of CAAP license of drone operation
     5. CAAP permit for the activity.

 

XI. Repair and Maintenance Telco Facilities.

A. Underground

  • Letter of Request (If contractor, submit Endorsement from telco)
  • Drawing Showing Location of all Manholes.
  • JHA
  • Traffic Management Plan (Drawing).

B. AERIAL

  • Letter of Request (If contractor, Submit Endorsement from Telco)
  • Drawing 
  • JHA

 

XII. Construction Related Installation Roadway

A. Safety Net 

  1. Letter 
  2. Drawing
  3. NO objection

B. Tower Crane Operation 

Letter W/Endorsement from Developer

  1. Drawing Showing 
    • Footprint of boom 
    • Reach of boom

     2. No Objection from affected Bldg.
     3. JHA
     4. Third-party certificate of cranes safety.

C. Wrap-around Net

Inverted Umbrella (Cath pan)

  • Letter of Request 
  • Drawing

D. Board-up/ Sidewalk Ensure:

  • Letter of Request 
  • Plan /Section

E. Man hoist (Temporary Elevator)

  • Letter of Request 
  • Plan. Elev.+Section.

F. Signboard 

  • 1.Letter 
  • 2. Drawing/Photo/Location of Insta 1 later.

G. OSP (Overhead Road Safety Net)

  • Letter of Request 
  • Drawing 
  • No Objection from affected Bldg. 
  • JHA
  • Commitment Letter that the sidewalk.